Fraser Field was constructed in the early 1940’s as a 4.500 bleacher seat, cast-in-place concrete baseball stadium with a cast-in-place reinforced concrete riser system supported by cast-in-place concrete beams and columns. Of particular note is the middle portion of the grandstand, which is covered by a unique cantilevered cast in place concrete roof system in the form of an arc. The project involved removing the deteriorated concrete on both the top and underside grandstand surfaces as well as cleaning any corroded reinforcement as required. Visible cracks were routed and scaled, expansion joints were replaced, and an elastometric coating was applied to the top and underside roof surfaces. Finally, a pedestrian grade urethane traffic bearing coating system was applied to the entire top surface of the grandstands. The project was completed in six months.

Location: 
Lynn, Massachusetts
Project Value: 
$2,246,042
Duration of Project: 
6 Months
Project Owner: 
City of Lynn
Architect: 
CBI Consulting Inc.

Click on the images below for a larger view